Process

PT

The collaboration adapts to the stage and needs of each partner, from the conception of the piece to the precise execution of a design already defined.

1. Getting to know the project

We arrange a meeting or welcome you at the atelier in Arrentela, Seixal (8:00–18:00, preferably by appointment), to learn about your project and think together about the best solution in solid wood.

2. Requesting a quote

Send us the technical drawings with measurements and material specifications.

3. Choosing the form of partnership

  • Design and production: we develop the design of the piece with you.
  • Production: we start from the project you have already created, respecting the original design and intent.

4. Technical drawing

Every piece starts from a precise drawing that ensures proportion, fit and execution faithful to the project.

5. Production at the atelier

The piece is made in solid wood, with construction choices guided by knowledge of the material, from the grain to its behaviour.

6. Installation

We install throughout Portugal.

Materials and finishes

We work in solid wood, with oil, wax, varnish and lacquer finishes.

Lead times

2 weeks to 1 month is the estimated lead time for small projects; larger projects have a timeline defined case by case.

Have a project in hand?

We would be glad to arrange a meeting or welcome you at the atelier to learn about your project and think together about the best solution in solid wood.